Limit search to available items
E-book
Author Stehr, Richard A., author

Title Bridge preservation, improvement and replacement guidelines for fiscal year 2006 through 2008 / Richard A. Stehr
Published Minnesota : Minnesota. Department of Transportation, 2006

Copies

Description 1 online resource (49 pages)
Series Technical memorandum ; no. 06-10-B-01
Summary "The Bridge Office has revised its Guidelines for Bridge Repair and Replacement to better describe when design exceptions must be approved on bridge improvement projects; the specific minimum permit load capacity for bridge improvement projects on Interregional Corridors (IRCs) and interstate highways was also revised; as was the bridge railing reconstruction policy (Appendix E). A new policy for repair and extension of Type W box culverts (Appendix J) has alo been added, as well as a revised policy for Bridge Maintenance Painting of Steel Structures (Appendix H)."--purpose statement from title page
Notes Title from resource description page (viewed April 10, 2019)
In English
Subject Bridges -- Maintenance and repair.
Bridges -- Design and construction.
Bridges -- Design and construction
Bridges -- Maintenance and repair
Genre/Form Legal memorandums
Legal memorandums.
Notes juridiques.
Form Electronic book
Author Minnesota. Department of Transportation. Engineering Services Division, issuing body.